project
clean water |
|
|
|
|
|
| |
Standard Urban Stormwater Management Plan (SUSMP) and
Hydromodification Workgroup
New - BMP Sizing Calculator
(updated April 2011, Version 3.0)
Login Details
User ID: sdc_hmplive
Password: sdchmp1!
Notes:
Import
and export instructions (.pdf)
Instructions to use the BMP Sizing Calculator are provided after login
The calculator requires Internet Explorer v7.0 or greater
Popup blockers need to be disabled required for report printing
Minimum screen resolution: 1280 x 960 pixels
This BMP Sizing Calculator is a tool offered to assist the public with permit compliance, but its use is not intended to guarantee or warrant compliance, which is the independent responsibility of the user. In no event will the San Diego area municipal Copermittees be liable for any incidental, special or consequential damages of any kind (including, but not limited to, loss of information or other monetary loss) arising in any way in connection with the use or inability to use the BMP Sizing Calculator accessed from this website.
CLICK HERE FOR THE BMP SIZING CALCULATOR
*For further assistance, please call Eric Mosolgo (858) 571-6736 or email at
emosolgo@BrwnCald.com.
|
|
Station
|
.wdm File
|
.csv File
|
Tech Memo
|
Bonita
|
|
|
|
Borrego
|
|
|
|
Encinitas
|
|
|
|
Escondido
|
|
|
|
Fallbrook
|
|
|
|
Fashion Valley
|
|
|
|
Flinn Springs
|
|
|
|
Kearny Mesa
|
|
|
|
Lake Cuyamaca
|
|
|
|
Lake Heneshaw
|
|
|
|
Lake Wohlford
|
|
|
|
Lindbergh Field
|
|
|
|
Lower Otay
|
|
|
|
Oceanside
|
|
|
|
Poway
|
|
|
|
Ramona
|
|
|
|
San Onofre
|
|
|
|
San Vicente
|
|
|
|
Santee
|
|
|
|
|
|
|
|
|
|
|
|
|
Regional Water Quality Control Board Order R9-2007-0001
Provision D.1.g (6) (Board Order) requires the County of
San Diego and its NPDES Co-permittees to identify
Interim Hydromodification Criteria (IHC) within 365 days
of Order adoption (i.e., by January 24, 2008). The
interim criteria will apply until the final Hydrograph
Modification Management Plan (HMP) is implemented. The
IHC is described in the order as an interim range of
runoff flow rates for which Priority Development Project
post-project runoff flow rates and durations shall not
exceed pre-project runoff flow rates and durations.
The purpose of the IHC is to prevent development-related
changes in stormwater runoff from causing, or further
accelerating, stream channel erosion or other adverse
impacts to beneficial stream uses. This memorandum
provides background on fluvial geomorphology and
hydrograph modification management, describes flow
control criteria applied in other HMPs, and provides a
recommendation for developing the San Diego IHC.
|
|
| |
|
|
Information coming soon.
|
| |
|
|
|
|
|
|
|
Workgroup Chair: Sara
Agahi, County of San Diego
For more information, questions, or comments, please contact Sara
Agahi at 858.694.2665
|
|
|
Meetings are open to all interested parties.
Meeting(s)
T.B.D.
Meeting Summaries
|
|
|
|
|
| |
|
|
| |
|
|
|
clean
water through local commitment and action
PCW Webmaster
|
|